The UDS SRC President, Master Lukman Mohammed, under whose reign the outrageous GHC63,000.00 bus “stop” project was executed has been fished out.
In our previous report, we made mention of the breakdown of the amount spent on the single bus terminal with a wooden relaxation bench.
A breakdown of the amount for the construction of the single bus terminal with a wooden bench reveals the SRC executives spent Ghc45,160,62 while the fabrication and installation of a single relaxation bed cost them Ghc18,014.85.
The cost of the project has killed every hope Netizens have for the future of the country as the future leaders are proving to be no different from the current leaders of the country.
Apparently, other student leaders made efforts to impeach him.
See his photo below;